Control Calendar (HTML, PDF) | Control Sites | Field Operations Group
Control Sites
Site Detail
Download all relevant pdf's here. View Events associated
with this site at the bottom of the page.
Site Definitions
- Active - Site-Specific Control Plan is being implemented (ongoing)
- Inactive - the site has been included as a sub-area in another site
- Complete - Non-native Spartina has been eradicated from this site (monitoring may be ongoing)
| Site# |
Year
Started |
Status |
Name |
| 010 |
2004 |
Active |
Point Pinole Regional Shoreline
Contra Costa County |
| |
Description |
| |
Point Pinole Regional Shoreline is a 2,315-acre park owned by the East Bay Regional Parks District. It is located to the west of the city of Richmond, in Contra Costa County. Point Pinole opened to the public in 1973 after the property was acquired from Bethlehem Steel. Bethlehem had acquired the land in the early 1960s from Atlas Powder Co., one of several firms that had manufactured gunpowder and dynamite there for almost 100 years. The park occupies a short peninsula composed of a main upland core with open, grassy parklands interspersed with predominantly eucalyptus woodlands. Along the northern portion of the park, a wide border of high marsh pickleweed characterizes Whittell Marsh, Sub-Area 10a. The southern portion of the park, Sub-Area 10b is a narrow band of tidal marsh grading quickly over a 10-20 meter span from high marsh pickleweed to sandy mudflat.
The non-native Spartina infestations at Point Pinole are in the early stages of establishment. The individual locations of these plants are scattered within both of the Sub-Areas, but their overall acreage is small, at under 0.7 acre. The primary treatment method at this site is aquatic herbicide, which will be applied by backpack sprayer. The partner on this site is the East Bay Regional Parks District.
|
Documents
 |
| |
Site Specific Plan |
| |
06/02/05 |
Site Specific Plan (PDF) (DOCUMENT, 108K) |
 |
| |
Attachment 1: Site Maps and Photographs |
| |
06/02/05 |
Photos and Maps (PDF) (DOCUMENT, 496K) |
 |
| |
Attachment 2: Work Program |
| |
06/02/05 |
Work Program (PDF) (DOCUMENT, 191K) |
 |
| |
Attachment 3: Environmental Compliance |
| |
09/20/04 |
DFG Authorization (PDF) (DOCUMENT, 79K) |
| |
10/04/04 |
Notice of Intent (PDF) (DOCUMENT, 311K) |
| |
06/02/05 |
Environmental Compliance (PDF) (DOCUMENT, 130K) |
 |
| |
Attachment 4: Site Safety and Materials Handling |
| |
06/06/05 |
Site Safety & Materials Handling (HTML) (DOCUMENT, 4K) |
Events
Event Definitions
- Planned - this control work event has been scheduled by the contractor or ISP partner
- Complete - the specific control event for a given date(s) has been completed
The Start and End Date(s) listed below are the expected days for the Control Event based on the estimates provided by the contractor or ISP partner, and are subject to change.
The Control Program is implementing multi-year plans on the non-native Spartina infestations around the San Francisco Estuary. If the status of a Control Program event is listed as "Complete", it refers to the implementation of the plan for the posted event for a given year, and does not imply that the site has yet reached eradication. Please refer to the Site-Specific Plans for more information and a projected timeline to eradication for a given site.
Click on Start Date for details
| Start Date |
|
End Date |
Type |
Status |
| 09/09/05 |
|
|
Spray |
Complete |
|